Installation & Commissioning · 2026-11-14 · 昊诚工控

A Practical Air-Tightness Check for Sealed Electrical Cabinets

Tightness is a prerequisite

A closed-loop cooling unit keeps cabinet air separate from ambient air. That assumption fails as soon as there is a permanent opening. Unlike a door opened briefly for maintenance, a fixed gap adds a continuous heat and moisture load that was never in the sizing calculation.

Three checks before handover

Leak locationTypical signAction
Door gasket cornerDust line, uneven compressionReseat gasket, adjust hinge
Gland plateOpen spare holesBlanking plate or sealed gland
Drain outletWarm air traceFit a one-way drain device

Record the result as a commissioning baseline. A later change in internal temperature behaviour is much easier to interpret when the as-built tightness was documented at handover.

These are selection and configuration notes; final values depend on cabinet dimensions and site conditions. See product specifications or contact us for a project-specific configuration.

FAQ

Is a visual inspection enough?

It finds most large leaks, but a compressed-looking gasket can still leak at a corner. A tracer pass is a quick supplement.

Does a leak invalidate the load calculation?

It adds a term the calculation did not include. Re-check tightness before increasing the specified cooling capacity.

Should smoke be used near energised equipment?

Only with the appropriate site procedure and tracer type, kept outside the live area. A paper strip at the joint is often sufficient.