Starting Current and Supply Planning for Cabinet Air Conditioners

Two different currents

The steady running current describes normal operation. The brief current drawn at compressor start is higher, and it is the value that decides whether a protective device trips, whether a long cable drops too much voltage, and whether a generator or UPS can support the unit alongside the rest of the panel.

What to confirm before the schematic is released

Ask for the starting figure and the recommended protective device rating as part of the technical file. If several units sit on one feeder, a staggered start in the control logic avoids summing their starting currents into a single event — a control decision, not a hardware upgrade.

These are selection and configuration notes; final values depend on cabinet dimensions and site conditions. See product specifications or contact us for a project-specific configuration.

FAQ

Is the running current enough to size the breaker?

No. Also check the starting current and the trip curve; a breaker that only matches running current may nuisance-trip on start.

What changes on a generator or UPS site?

The source must cover simultaneous restarts. Check the starting demand of all units plus other loads, and consider staggered starts.

Does supply frequency affect the unit?

Yes. Frequency and voltage are specified per destination and confirmed in the technical file before the panel is built.